Concertina doors for Central Station

27 March 2023
ATDC steel concertina doors installed for Central Station in Sydney.

ATDC has just completed an impressive installation of its steel concertina doors to the Eddy Avenue entrance and side entry (northern concourse) of this heritage-listed landmark site.

Central Station is Australia’s largest train station both in size and passenger numbers and is an integral transport interchange for Sydney’s light rail, commuter trains and bus services.

ATDC installed these concertina doors in a side-by-side tandem overhead tracking configuration, which minimized the storage depth of these doors to only 8% of the overall spans. Lock up has been achieved through a series of intermediate up/down locking mechanisms, which offer seamless lock up without the need for any floor tracking or wall attachments.

The doors were specified by renowned architectual firm Woods Bagot, with Laing O'Rouke overseeing the installation.

All installation works were carried out between 10pm and 4am over three consecutive nights by ATDC’s skilled installation crews. 

For further technical information about these side-by-side systems, click here

Concertina doors for Central Station

ATDC has just completed an impressive installation of its steel concertina doors to the Eddy Avenue entrance and side entry (northern concourse) of this heritage-listed landmark site.

Central Station is Australia’s largest train station both in size and passenger numbers and is an integral transport interchange for Sydney’s light rail, commuter trains and bus services.

ATDC installed these concertina doors in a side-by-side tandem overhead tracking configuration, which minimized the storage depth of these doors to only 8% of the overall spans. Lock up has been achieved through a series of intermediate up/down locking mechanisms, which offer seamless lock up without the need for any floor tracking or wall attachments.

The doors were specified by renowned architectual firm Woods Bagot, with Laing O'Rouke overseeing the installation.

All installation works were carried out between 10pm and 4am over three consecutive nights by ATDC’s skilled installation crews. 

For further technical information about these side-by-side systems, click here

The Australian Trellis Door Company

Head Office

The Australian Trellis Door Company

Unit A6

366 Edgar St

Condell Park, NSW, 2200

02 9519 0...

Regional Office/Distributor

The Australian Trellis Door Company

Somerton Park, SA, 5044

08 8374 0...

Regional Office/Distributor

The Australian Trellis Door Company

315 Archerfield Road

Richlands, QLD, 4077

07 3375 5...

Regional Office/Distributor

The Australian Trellis Door Company

116 Wedgewood Rd

Hallam, Vic, 3803

03 9796 5...

Regional Office/Distributor

The Australian Trellis Door Company

203 Caridean St

Heathridge, WA, 6057

08 9403 4...